Siteco Lavori in terra, scavi, fondazioni e costruzione di gallerie,Dbayeh (Metn)

Specialities & Contracting
Dbayeh (Metn) P.O.Box 70-162- Libano

Presentazione·  Siteco

Activities:
-Design & execution of post tension works.
Supply & installation of expansion joints & bearings.
Design & execution of geotechnical works: piling, micropiles, shotcrete, anchors, nails, grouting & soil investigations.
Concrete repair works: epoxy injection, carbon fiber strengthening & general repairs.

Companies represented:
BBV Post Tensioning systems
FIP Industrial

Main owners:
•Mr. Michel N Francis (Owner)

Dirigenti·  Siteco Scarica la lista di dirigenti

Mr. Michel N Francis

COO - Direttore Operativo / General manager (Managing Director)

Mappa ·   Siteco

Ground floor, Al Rabih building, - Off highway - Dbayeh (Metn) P.O.Box 70-162 - Libano

Di più su - Siteco

Visita il nostro sito per più info

Registrazione Kompass

Kompass ID? LB012474

Informazioni chiave - Siteco

Natura Sede centrale
Anno di iscrizione 1999
Forma giuridica Business with goodwill
Descrivi la tua azienda e attrai opportunità di business
N° di registrazione 66602 Baabda
Dipendenti presso azienda Dato disponibile con abbonamento

Informazioni generali -  Siteco

Banche
Area di Import
Europa Occidentale, Asia-Pacifico
Area di Export
Medio Oriente

Le nostre aziende di fiducia

Potrebbe interessarti anche: